Most customers tell us installation day felt easier than a furniture delivery. Here's exactly what to expect when our crew pulls up.
Morning: Setup and Safety
The crew chief walks the plan with you, confirms panel placement, and sets up roof protection, harnesses and a tidy ground staging area. Power stays on — we work around your day.
Midday: Rails, Panels, Wiring
Mounting rails go up first, torqued to engineering spec, then panels are flown up, clamped and wired in strings. The inverter and disconnects are mounted near your main panel, with conduit runs kept square and painted to match.
Afternoon: Testing and Tour
Every string is tested for voltage and insulation before commissioning. We then hand you the monitoring app, show your live production, and walk the roof work with you for sign-off.
After We Leave
We file the final inspection and utility interconnection paperwork, and our desk watches your first 30 days of production to confirm everything performs as modelled. Most homes are fully live within two weeks of install day.